Red de Bibliotecas Virtuales de Ciencias Sociales en
América Latina y el Caribe

logo CLACSO

Por favor, use este identificador para citar o enlazar este ítem: https://biblioteca-repositorio.clacso.edu.ar/handle/CLACSO/249740
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.creatorVignolo Cueva, Giancarloes
dc.date2016-03-14-
dc.date.accessioned2024-02-25T20:50:11Z-
dc.date.available2024-02-25T20:50:11Z-
dc.identifierhttps://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405-
dc.identifier.urihttps://biblioteca-repositorio.clacso.edu.ar/handle/CLACSO/249740-
dc.descriptionThe subject of this article is to show an overview of a problem that occurred in the Peruvian Electricity Sector in 2004 and, unfortunately, still produces practical and legal effects in the current system. We refer to the “physical withdrawals of capacity and energy from the SEIN for the attention of the regulated market”, by the different distribution companies without having a PPA signed and valid with any generating power company.en
dc.descriptionEl objeto del presente artículo consiste en mostrarle al lector un panorama general sobre un problema que ocurrió en el sector eléctrico peruano en el 2004 y que lamentablemente aún produce efectos prácticos y jurídicos en el ordenamiento vigente, pues no ha podido ser resuelto y solucionado de manera integral y definitiva. Nos referimos a los retiros físicos de potencia y energía del SEIN, destinados a la atención del mercado regulado, por parte de las distintas empresas distribuidoras, sin que tengan un contrato de suministro (PPA) firmado y vigente con alguna empresa generadora.es
dc.formatapplication/pdf-
dc.languagespa-
dc.publisherFondo Editorial de la Universidad de San Martín de Porreses
dc.relationhttps://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405/350-
dc.rightsDerechos de autor 2016 Giancarlo Vignolo Cuevaes
dc.sourceVox Juris; Vol. 30 No. 2 (2015): VOX JURIS 30; 227-239en
dc.sourceVox Juris; Vol. 30 Núm. 2 (2015): VOX JURIS 30; 227-239es
dc.source2521-5280-
dc.source1812-6804-
dc.subjectCrisis of PPAen
dc.subjectphysical withdrawals without PPAen
dc.subjectmarginal costs of short-termen
dc.subjectspot marketen
dc.subjectbus bar tariffen
dc.subjectPPAen
dc.subjectSEINen
dc.subjectCrisis de los contratoses
dc.subjectretiros sin contratoes
dc.subjectcostos marginales de corto plazoes
dc.subjectmercado spotes
dc.subjecttarifa en barraes
dc.subjectPPAes
dc.subjectSEINes
dc.titleWithdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequencesen
dc.titleRetiros de potencia y energía del sistema eléctrico interconectado nacional, sin respaldo contractual para la atención del mercado regulado, llevados a cabo por las empresas peruanas de distribución eléctrica: Antecedentes, causas y consecuenciases
dc.typeinfo:eu-repo/semantics/article-
dc.typeinfo:eu-repo/semantics/publishedVersion-
Aparece en las colecciones: Revistas - Cosecha

Ficheros en este ítem:
No hay ficheros asociados a este ítem.


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.