Repositorio Dspace

Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences

Mostrar el registro sencillo del ítem

dc.creator Vignolo Cueva, Giancarlo es
dc.date 2016-03-14
dc.date.accessioned 2024-02-25T20:50:11Z
dc.date.available 2024-02-25T20:50:11Z
dc.identifier https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405
dc.identifier.uri https://biblioteca-repositorio.clacso.edu.ar/handle/CLACSO/249740
dc.description The subject of this article is to show an overview of a problem that occurred in the Peruvian Electricity Sector in 2004 and, unfortunately, still produces practical and legal effects in the current system. We refer to the “physical withdrawals of capacity and energy from the SEIN for the attention of the regulated market”, by the different distribution companies without having a PPA signed and valid with any generating power company. en
dc.description El objeto del presente artículo consiste en mostrarle al lector un panorama general sobre un problema que ocurrió en el sector eléctrico peruano en el 2004 y que lamentablemente aún produce efectos prácticos y jurídicos en el ordenamiento vigente, pues no ha podido ser resuelto y solucionado de manera integral y definitiva. Nos referimos a los retiros físicos de potencia y energía del SEIN, destinados a la atención del mercado regulado, por parte de las distintas empresas distribuidoras, sin que tengan un contrato de suministro (PPA) firmado y vigente con alguna empresa generadora. es
dc.format application/pdf
dc.language spa
dc.publisher Fondo Editorial de la Universidad de San Martín de Porres es
dc.relation https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405/350
dc.rights Derechos de autor 2016 Giancarlo Vignolo Cueva es
dc.source Vox Juris; Vol. 30 No. 2 (2015): VOX JURIS 30; 227-239 en
dc.source Vox Juris; Vol. 30 Núm. 2 (2015): VOX JURIS 30; 227-239 es
dc.source 2521-5280
dc.source 1812-6804
dc.subject Crisis of PPA en
dc.subject physical withdrawals without PPA en
dc.subject marginal costs of short-term en
dc.subject spot market en
dc.subject bus bar tariff en
dc.subject PPA en
dc.subject SEIN en
dc.subject Crisis de los contratos es
dc.subject retiros sin contrato es
dc.subject costos marginales de corto plazo es
dc.subject mercado spot es
dc.subject tarifa en barra es
dc.subject PPA es
dc.subject SEIN es
dc.title Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences en
dc.title Retiros de potencia y energía del sistema eléctrico interconectado nacional, sin respaldo contractual para la atención del mercado regulado, llevados a cabo por las empresas peruanas de distribución eléctrica: Antecedentes, causas y consecuencias es
dc.type info:eu-repo/semantics/article
dc.type info:eu-repo/semantics/publishedVersion


Ficheros en el ítem

Ficheros Tamaño Formato Ver

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Buscar en DSpace


Búsqueda avanzada

Listar

Mi cuenta