This research was conducted in the drainage district of Valle de Sibundoy, located in 1º 12′ 12″ N and 76º 51′ 15″ O. A simulation was carried out using the hydrological model SWAT to estimate water balance and the model was gauged for the water volumes and sediments. The hydrological modelling enabled to estimate the average monthly water volume for this basin at 32.26 m3/s. regarding the sediment production, under the current conditions of soil use for this basin, the water catchment was calculated at 1.18 T/ha/a. Aided with climate change scenarios, it was determined that in 2046 the average sediment production will be exceeded in more than 200%. Finally, some alternatives for mitigating the impacts are proposed, based on the soil preservation, sustainable productive systems, coverage restoration and risk management in the water resource.
Esta investigación se desarrolló en el distrito de drenaje del Valle de Sibundoy, localizado a 1º 12′ 12″ N y 76º 51′ 15″ O. Se realizó una simulación empleando el modelo hidrológico SWAT para estimar el balance hídrico y una calibración del modelo para caudales y sedimentos. Con la modelación hidrológica, se estimó un caudal promedio mensual para la cuenca de 32,26 m3/s. Para la producción de sedimentos, con las condiciones actuales de uso de suelo para la cuenca, se calculó un aporte de 1,18 T/ha/a. Con la ayuda de escenarios de cambio climático, se determinó que para el año 2046 se sobrepasará en más del 200 % la producción media de sedimentos. Finalmente, se proponen alternativas de mitigación de impactos, basadas en conservación de suelos, sistemas productivos sustentables, restauración de coberturas y gestión del riesgo en el recurso hídrico.